THE CHALLENGE: The client had ordered over twenty lighter weight Hercules bodies to suit the updated mine plan; however, they were left with five of the previous design. The client approached Schlam and asked.
THE CHALLENGE: Mackellar Group was presented with the challenge of delivering a genuine 240 metric tonne truck solution to enable four-pass loading with hydraulic excavators (36 cubic metres) or potentially to.
THE CHALLENGE Planning is everything when it comes to successfully completing a shutdown; however, in the case of the PV-351, sometimes a job throws you a curveball. Parts that were ordered well in advance for.
Dawson Mine is an open-cut metallurgical coal mine operation made up of three operating pits – North, Central and South. It commenced operations in 1961 and is one of the oldest coal mining operations in.